Brought to you by EastTexasNews.com

etautos

 

Home » USA » NY » Flushing » BMW » M5 » 2022 BMW M5

2022 BMW M5 in Flushing, NY - $93,987

0 Reviews

I'm interested
Message Successfully Sent!
Dealer
Hello,
I would like to learn more about the 2022 BMW M5 that you have in your inventory. Please contact me as soon as you can.
Thank you.
By using this feature, you agree to EveryCarListed.com’s Terms of Use.
Seller's Comments
BMW Certified, LOW MILES - 29,219! Heated Leather Seats, Sunroof, NAV, Onboard Communications System, iPod/MP3 Input, Satellite Radio. Premium Sound System, EXECUTIVE PACKAGE, DRIVING ASSISTANCE PROFESSIONAL PACKA... SEE MORE!BUY WITH CONFIDENCEAdditional plans are available to extend coverage, if desired, Every vehicle is thoroughly inspected and reconditioned by BMW-Certified technicians, 1-Year/Unlimited Miles plus balance of original new vehicle limited warranty (4-Year/50,000-miles), Roadside Assistance includes jump starts, tire changes, lock out service, and fuel/fluid delivery, 24/7 Roadside Assistance (even if someone else is driving your vehicle), Trip interruption benefits are included, Service vehicle and/or alternate transport are included for the duration of your protection plan OPTION PACKAGESEXECUTIVE PACKAGE Front Ventilated Seats, Active Park Distance Control, Soft-Close Automatic Doors, Drive Recorder, Surround View w/3D View, Rear View Camera, Front Massaging Seats, Power Rear Sunshade & Rear Side Window Shades, Front & Rear Heated Seats, Parking Assistant Plus, DRIVING ASSISTANCE PROFESSIONAL PACKAGE Active Driving Assistant Pro, Active Cruise Control w/Stop and Go, Active Lane Keeping Assistant w/side collision avoidance, Traffic Jam Assistant, Evasion Aid and Cross-Traffic Alert Front, Extended Traffic Jam Assistant, For limited access highways, WHEELS: 20 X 9.5 FR & 20 X 10.5 RR BLACK Style 706M, M double-spoke, Tires: 275/35R20 Fr & 285/35R20 Rr Performance, Non run-flat, MOONROOF, SILVERSTONE, EXTENDED MERINO LEATHER UPHOLSTERY. KEY FEATURES INCLUDENavigation, Premium Sound System, Satellite Radio, iPod/MP3 Input, Onboard Communications System, Turbocharged, Remote Engine Start, Dual Zone A/C, Smart Device Integration, Hands-Free Liftgate, Apple CarPlay�, WiFi Hotspot, Active Suspension System, Power Passenger Seat, Power Driver Seats. Rear Air, Steering Wheel Controls, Keyless Entry, He
Vehicle Highlights
Price
$93,987
Mileage
29,219
Color
Condition
Used
Drivetrain
AWD
Engine
8 CYL.
Transmission
Automatic
Fuel
VIN
WBS83CH02NCK10842
Stock Number
UB19932
Location
US, NY
Features
ABS Brakes (4-Wheel)
Adjustable Rear Headrests
Air Conditioning - Front - Automatic Climate Control
Air Conditioning - Front - Dual Zones
Air Conditioning - Rear - Automatic Climate Control
Air Conditioning - Rear - Dual Zones
Air Conditioning - Rear - With Independent Controls
Air Conditioning Air Filtration: Active Charcoal
Airbags - Front - Dual
Airbags - Front - Knee
Airbags - Front - Side
Airbags - Front - Side Curtain
Airbags - Passenger - Occupant Sensing Deactivation
Airbags - Rear - Side Curtain
Ambient Lighting Color-Adjustable
Audio - Antenna: Diversity
Audio - Antenna: Mast
Audio Auxiliary Input: IPod/IPhone Integration
Audio Auxiliary Input: USB
Auto-Lock
Blind Spot Sensor
Braking Assist
Braking assist hill start assist
Cargo Area 12V Power Outlet
Cargo Area Light
Center Console Front Console With Armrest And Storage
Child Safety Locks
Child Seat Anchors LATCH System
Clock
Compass
Cornering Brake Control
Cross Traffic Alert Rear
Cruise Control
Crumple Zones Front
Daytime Running Lights LED
Digital Odometer
Door Courtesy Lights
Doors Rear Door Type: Power Liftgate
Driver Adjustable Suspension: Ride Control
Driver Attention Alert System
Driver Seat Adjustable Lumbar Support: 4-Way Power
Driver Seat Heated
Driver Seat Power Adjustments: 20
Driver Seat Power Adjustments: Recline
Drivetrain 4WD Type: Full Time
Drivetrain Drive Mode Selector
Drivetrain Locking Differential: Rear
Easy Entry Power Steering Wheel
Electronic Brakeforce Distribution
Electronic Messaging Assistance With Voice Recognition
Electronic Parking Brake Auto Off
Emergency Braking Preparation
Emergency Interior Trunk Release
Engine Auto Stop/Start
Engine Push-Button Start
Exterior Entry Lights Puddle Lamps
Exterior Entry Lights Security Approach Lamps
Exterior Mirrors Driver Side Auto-Dimming
Exterior Mirrors Heated
Exterior Mirrors Integrated Turn Signals
Exterior Mirrors Power
Exterior Mirrors Power Folding
Exterior Mirrors Reverse Gear Tilt
External Temperature Display
Floor Mat Material Carpet
Front 12V Power Outlet(s)
Front Headrests Power Adjustable
Front Seatbelts: 3-Point
Front Suspension Classification: Independent
Front Suspension Type: Double Wishbones
Front Suspension Type: Strut
Fuel Economy Display MPG
Fuel Economy Display Range
Head-Up Display
Headlights Auto Delay Off
Headlights Auto On/Off
Headlights Automatic High Beam Dimmer
Headlights Cornering
Headlights LED
Headlights Self-Leveling
Heated Steering Wheel
Impact Sensor Alert System
Impact Sensor Battery Disconnect
Impact Sensor Door Unlock
Impact Sensor Fuel Cut-Off
Impact Sensor Post-Collision Safety System
Inside Rearview Mirror Auto-Dimming
Interior Aluminum Accents
Interior Carbon Fiber Trim
Interior Leather Accents
Lane Deviation Sensors
Memorized Settings Includes Audio System
Memorized Settings Includes Climate Control
Memorized Settings Includes Driver Seat
Memorized Settings Includes Exterior Mirrors
Memorized Settings Includes Passenger Seat
Memorized Settings Includes Steering Wheel
Memorized Settings Number Of Drivers: 2
Mirror Color Body-Color
Multi-Function Display
Navigation System Hard Drive
Navigation System Touch Screen Display
Navigation System With Voice Recognition
Number Of Front Headrests 2
Number Of Rear Headrests 3
One-Touch Windows: 4
Parking Sensors Front
Parking Sensors Rear
Passenger Seat Heated
Passenger Seat Power Adjustments: 20
Passenger Seat Power Adjustments: Recline
Power Brakes
Power Steering Speed-Proportional
Power Windows: Remote Operation
Power Windows: With Safety Reverse
Pre-Collision Warning System Audible Warning
Pre-Collision Warning System Visual Warning
Pre-collision Warning System Vibrating Steering Wheel
Reading Lights Front
Reading Lights Rear
Rear 12V Power Outlet
Rear Bumper Color Body-Color
Rear Seats 40-20-40 Split Bench
Rear Seats Center Armrest: Folding With Pass-Thru
Rear Seats Center Armrest: With Cupholders
Rear Seats Split Folding
Rear Spoiler Lip
Regenerative Braking System
Remote Engine Start
Seatbelts Emergency Locking Retractors: Front
Seatbelts Emergency Locking Retractors: Front And Rear
Seatbelts Seatbelt Force Limiters: Front
Seatbelts Seatbelt Force Limiters: Front And Rear
Seatbelts Seatbelt Pretensioners: Front
Seatbelts Seatbelt Warning Sensor: Driver And Passenger
Seatbelts Second Row 3-Point
Seats - Driver Seat Power Adjustments: Height
Seats - Passenger Seat Power Adjustments: 4-Way Power Lumbar
Seats - Passenger Seat Power Adjustments: Height
Seats Front Seat Type: Sport Bucket
Security Anti-Theft Alarm System
Security Engine Immobilizer
Sport Suspension
Stability Control
Steering Wheel Mounted Controls Audio
Steering Wheel Mounted Controls Cruise Controls
Steering Wheel Mounted Controls Multi-Function Screen Controls
Steering Wheel Mounted Controls Paddle Shifter
Steering Wheel Mounted Controls Phone
Steering Wheel Mounted Controls Voice Recognition Controls
Steering Wheel Power Tilt And Telescopic
Suspension Active
Suspension Stabilizer Bar(s): Front
Suspension Stabilizer Bar(s): Rear
Tachometer
Tail And Brake Lights LED
Taillights Adaptive
Touch-Sensitive Controls
Traction Control
Traffic Sign Recognition
Trip Odometer
Universal Garage Door Opener Homelink
Vanity Mirrors Dual Illuminating
Warnings And Reminders Low Fuel Level
Warnings And Reminders Low Oil Level
Warnings And Reminders Maintenance Reminder
Windows Front Wipers: Rain Sensing
Windows Front Wipers: Speed Sensitive
Windows Front Wipers: Variable Intermittent
Windows Heated Windshield Washer Jets
Windows Lockout Button
Windows Rear Defogger
Vehicle data is subject to change without notice. The publisher assumes no responsibility for errors and/or omissions in the data and reserves the right to cancel, to terminate or not to process orders where the price or other material information on this site is inaccurate.
Consumer Reviews for the 2022 BMW M5

No reviews found. Be the first to submit a review!

Dealer Information

Dealer

Flushing, NY 11362

 
Reviews for This Dealer

No reviews found. Be the first to submit a review!

Contact Us  |    Terms of Use  |    Privacy Policy  |    Site Map

©2025, EveryCarListed.com, LLC All rights reserved.